Please note the information on this map, if considering coming to PPA by motor vehicle:

Further details can be found here.
From Mike Powell,
PPAA Site Representative
Pontcanna Permanent Allotments, serving over two hundred Cardiff gardeners.
Please note the information on this map, if considering coming to PPA by motor vehicle:

Further details can be found here.
From Mike Powell,
PPAA Site Representative
Our attention’s been drawn to this page of the Council’s website.
It clarifies and explains some confusing aspects of the process, e.g. the procedure in the case of joint or multiple tenancies, and is very helpful.
Our thanks go to plot holder Louise Shenstone for flagging this to the Committee.
PPA Website Team
Everyone – particularly drivers – are advised that contractors Malcolm Thomas Ltd. will be on site reinstating the tarmac from their work of a few years ago, which the Council didn’t cover on that occasion. PPAA Committee have decided to fund this work themselves, and were very pleased with a quote of only £250 plus VAT.
Drivers are advised not to attempt to drive down this track until the work is finished, as even if it were open, their vehicles may be trapped if it were to begin after this time.
Update: the work is now complete and the tarmac reinstated at the necessary points.
PPA Website Team
There are a number of issues with the new Tenancy Agreements being sent out by Cardiff Council, that multiple plot holders have raised with the PPAA Committee:
A Tenancy Agreement is between the plot holder and the Council, and the PPAA Committee are not involved in its implementation. All queries and amendments regarding the new Tenancy Agreement should be therefore sent to the Council at Allotments@cardiff.gov.uk and not to PPAA Committee, who will shortly be making their own representations to the Council on these and related points.
Mike Powell, PPAA Site Representative
*Update: it’s been found, that after the first tenant invited to sign has done so, a further email is sent to the joint tenant to do so too (assuming that the Council have an address.)
The Council’s website clarifies some of the confusion engendered by initial engagement with the system.
Admin
As we enter peak wasp season, but also meet activity from other wildlife, it’s perhaps timely to remind all of the existence of this website page: Wasps, rats, other pests, and beneficial visitors e.g. bees. It explains what to do if a problem should arise.
Admin
Present: Gordon Goldsmith (Chair), Mike Powell (Site Representative), Wendy Gunter (Treasurer), Lewis Evans, Sue Pasek, Martin Pasek, Adrian Peters, Rhys Williams.
Apologies: None received.
The meeting opened at 19:00.
Matters arising from previous Minutes:
To be covered in agenda.
Chair’s report:
Site Representative’s report:
Mike will raise the related situation of non-billing by the Council and the requirement to have paid the bill to receive a new tenancy agreement.
Treasurer’s report:
Water Supply and Sewerage:
Delivery of manure:
New Contract roll out 2026:
Waste removal, skips etc:
Vacant Plot Clearing:
Green Truck Replacements:
AOB:
There was no further business, and the meeting ended at 20:13.
The next PPAA Committee meeting will be at 19:00 on Tuesday, 22nd September 2026, in the upstairs meeting room of The Cricketers, Cathedral Road, Cardiff.
Everyone on site will probably be pleased to hear that this serious problem has been resolved.
The leak had progressively worsened, and was losing about a cubic metre-and-a-half an hour of late, at a cost of £1.92 per cubic metre. Those fond of arithmetic can work out the annual cost of this to the Council Tax payers of Cardiff.
The contractors, Malcom Thomas Ltd., located the leak by successively halving the suspect length of pipe with isolating valves until they got it down to a length which could be economically replaced. They did the latter by threading smaller, 32mm MDPE pipe through the old apparatus, which avoided expensive and disruptive trench digging.
During the course of this work it was established that the leak was under the track which runs beside the tennis courts. There was some increase in greenery of the vegetation at the surface, but nothing striking. Malcolm explained that the water easily runs away and disperses through the alluvial gravel which lies beneath the soil here.
Here’s a plan of our installation as it stands, which shows the general location of its main features:
Note: mobile device users may need to download the file to view it.
Here are some pictures showing the replacement method:


We extend our sincere thanks to Rhodri Edwards, Technical Manager, Parks for overseeing this work, to its Project Manager Mark Davies, and to Malcolm Thomas and his staff for their professional work and for their genial presence on the site, but especially to our own group of volunteers for their turning off the water at night until these repairs could be done.
PPA Website Team