Annual poly tunnel bed draw

The PPAA communal poly tunnel, at the southeast end of site, has twelve beds, of several square metres each, for the use of tenants. They’re filled with Council compost, and this may have been supplemented by their gardeners.

Each of these is available for two continuous seasons (that is, two whole growing years), beginning on March 1st, so the next allocation will start 1st March 2027.

The twelve beds are split into two groups of six, and the respective sets of tenancies are staggered by a year. So each year, in February, a draw is held to select six tenants. (There are often more people wanting beds than beds.) Entry to the coming draw will close at midnight, 31st January 2027.

Current bed holders reaching the end of their two year term are more than welcome to enter the draw for a bed for a further two years. However, if the number of new applicants equals or exceeds the available beds, then priority’s given to the new applicants.

The beds will be allocated for the two growing seasons 1st March 2027 to 31st January 2029, to align broadly with plot tenancies (2nd Feb to 1st Feb), and to allow bed holders to maximise their use of the beds over the winter.

Conditions for entering the draw:

Entrants must be PPAA plot holders, with a valid Council Tenancy Agreement for the coming year, and be paid-up full current members of the PPAA (five pounds annual subscription.) Only plot holders named on the tenancy can apply, and only one application per holding is allowed. Successful candidates can’t sublet or transfer their grow bed to other plot holders.

Successful applicants will need to pay a further five pounds a year, towards the poly tunnel’s upkeep.

Should a successful candidate stop being a tenancy holder, then their grow bed will be given up, and reallocated (if there’s a reasonable period left to run.)

PPAA plot holders, who fulfil the above conditions, are cordially invited to enter the draw.

The draw’s open from now on, but as mentioned, it closes at midnight on 31st January 2027, so those interested should email PPAA Committee before then. Please state clearly:

Name (required)

Plot number (required)

Full PPAA subscriber for 2026/27 (required)

Council Tenancy Fees paid for 2026/27 (*required, but we understand that owing to the Council’s backlog of updating records, some haven’t yet been billed. Due account will be taken of these facts on a case-by-case basis.)

Whether able to join poly tunnel working party? (Not essential)

The draw will be held by 8th February, and beds will be allocated for use from 1st March next year.

PPA Website Team

Likely interruptions to vehicular access to PPA site.

D&S Fabrications will be rehanging the Western Avenue end gate this Friday 13th November 2026. They will also do other jobs on site.

Work will start from 0830, and probably involve cutting, welding, heavy lifting and other actions.

Plot holders are therefore asked kindly not to distract the operatives, and also to keep maximum distance from this work, which has self-evident hazards.

In particular, drivers are notified that access for their vehicles may be interrupted for periods during the day, and are asked to be as patient as the work might dictate.

Thanks all in advance.

PPA Website Team

Minutes for PPAA Committee meeting, 1900, 3rd November 2026

Present:

Gordon Goldsmith (Chair), Mike Powell (Site Representative), Wendy Gunter (Treasurer), Sera Jones, Martin Pasek, Sue Pasek, Adrian Peters, Rhys Williams.

Apologies for Absence:

Lewis Evans, Nerys Lloyd Pierce.

Sera was welcomed to her first Committee meeting.

Matters arising from the previous meeting are dealt with below:

Site Representative’s Report (since last meeting):

  • The tree “amnesty” is proceeding with a good response.
  • Three working parties to clear derelict plots have been held.
  • Four plots have been let.
  • Three new tenants who have not cultivated their plots have been given final warning letters.
  • Two structure applications have been received.
  • Six names have been removed from waiting list, as no longer interested or not contactable etc.
  • Applicant at the top of the waiting list now dates from January 2026.
  • Waiting list is currently at about one hundred and seventy, and is still closed.
  • There are thirteen vacant plots on site, mostly badly overgrown, and with a large amount of rubbish to remove.
  • Further working parties are planned. These are needed, and with better attendance would be more effective still.
  • There have been three waste pick ups from four plots at a cost of £1,152, and other contractor charges of £400.
  • The Site Representative’s Fee of £389 has been received (four months late.)
  • Numerous emails have been sent on behalf of tenants to the Allotments Office regarding the New Tenancy Agreement and other issues.
  • The Council’s new Orkastrate system for managing allotment tenancies remains “read only” on the devices issued to Site Representatives, and so is still limited in usefulness.
  • Mike met with Allotments Officer on 21st October 2026 and resolved many issues.
  • Cardiff Allotments Holders Association (CAHA) met on 21st October, and will take the following issues to the Site Representatives’ meeting with Council officials:
  • Failure of Parks to reply to emails even within the twenty-eight days stated.
  • Failure by Parks to make clear what they will do about tenants who still do not have a new Tenancy Agreement in place by February.
  • Failure to issue invoices to many established and new tenants alike. What is the progress on the promised actions?
  • Failure of Parks to carry out and to follow through the eviction process according to specified procedure, and to inform Site Representatives as to whether plots are truly vacated – and therefore available to let – leading to plots once more becoming overgrown, and consequent disillusionment of volunteers through having their time and energies wasted.

Treasurer’s update:

Wendy said that PPAA finances are still healthy. However, plot clearance costs this financial year so far have been very significant. Tool replacement (see below), tree work, and further plot clearing will cost further significant amounts, and so expenditure will be reviewed at each future meeting.

New Tenancy Agreement roll-out:

No spreadsheet in digital format has been received, although it was promised for 23rd September. Some other sites have received them, however. Some information on the roll-out was given to Site Representative at the meeting with Allotments Officer on 21st October.

As of that date a hundred and sixty-four tenancies have been completed, which represents about sixty-eight percent of current PPA tenancies. Six plots were given up in response to the new Tenancy Agreement, with a further nine apparently to lapse later.

Break in, 24-25th October:

Both shop and lock up shipping container were broken into. Electric power tools and trolley were stolen along with other items.

It was agreed to replace power tools at a cost of about £2,000 and these will be stored off site from now on. The trolley will also be replaced.

A quote to enhance security of the lock up container will be obtained.

Manure deliveries:

Site Representative met with Ann Peate, Cardiff Riding School, 30th September 2026.

Assurances have been received that the contamination of manure deliveries with shredded rubber should now be minimal. It was agreed to continue to accept manure deliveries.

Mike Powell, Adrian Peters and Gordon Goldsmith will be responsible for receiving deliveries.

Contact lists and email addresses:

Tenants are reminded that both the PPAA and the Allotments office must be made aware of any change of email address.

Rodents etc.

John Morgan – plot holder who has expressed interest in addressing this matter – will be invited to the next meeting.

Bulb planting:

This is ongoing (Gordon Goldsmith and Nerys Lloyd-Pierce).

Plot 50b:

Plot 50b does not appear on the Council supplied database. There is some land behind 50a and this could be used by plot neighbours.

AOB:

Sue wanted to remind the Committee to be aware, that when acting in an official capacity, they should not appear to promote any partisan cause, which may lead to some people feeling unwelcome on the site.

Martin raised the issue of the possible disposal of the legacy petrol-powered tools. These will be assessed.

Adrian raised the issue of potential starter plots of one perch (approximately twenty-five square metres) with some mentoring. These could be offered for a year to new gardeners at the top of the waiting list as an optional alternative to taking on three to six perch plots. This idea will be discussed in detail at the next meeting.

Date of next meeting:

*1900, Tuesday, 1st December, 2026, at the upstairs meeting room, Cricketers Inn, Cathedral Road, Cardiff

Note: owing to a procedural oversight neither PPAA Committee nor Site Representative were in a position to review the minor adjustments made to the Minutes as received by this website before publication. They may be found here.

*Owing to several factors the next PPAA Committee meeting will now be on Tuesday 5th January 2027, and not as stated above.

PPA Website Team (minutes taken by Site Representative.)

Works parties – latest

PPAA Committee extend heartfelt thanks to the small band of volunteers who have consistently supported to the works parties, which have been clearing overgrown vacant plots.

Further works parties will be held on Friday 6th November from 2pm – meet at plot 78, and on Sunday, 8th November from 10.30am – meet at plot 29. (Site plan.)

It would be great to see some new faces!

Many thanks again to those who can make it.

(PPA Website Team, published on behalf of author.)